An adventure in sustainable, Off Grid living in country Victoria.
Thursday, April 10, 2014
Ducted heating!
While the relentless rain today forced me indoors, it didn't stop me from getting in the roof and installing some ducted heating for the winter. I basically put together a simple heat transfer system which draws hot air from the wood heated lounge room and sends it to the 2 bedrooms via a small (35 watt) inline fan and a bit of salvaged 150mm ducting. Just needs to get cold enough now to light a fire and try it out!
Wednesday, April 9, 2014
April 2014
Well the rain is here! After a pretty dry start to the year and a struggling vegie garden, things are finally greening up here as we approach the autumn/ winter months. The school holidays came and went with many hot days spent in the pool and on the deck.
Finally installed the new (old) double doors we bought on EBay 3 years ago!
Thursday, January 9, 2014
Summer Update
Well here we are in Jan 2014! So far a very mild start to the year with temperatures well below average for Jan. At least this allowed for the completion of the re weatherboarding on the west wall of the house. Earthwool batts and Silversark wrap created an R3 rating which has made a noticeable difference to the inside temperature of the house.
Let's see how it performs next week during the 3 days of 40+ degree days that are forecast!
At least the pool is sparkling clean!
Friday, August 30, 2013
Update Aug 2013
Hello again,
I know this post is a bit late but we wanted to see how the upgraded wind/solar system performed over the (very cold) winter that we just experienced in Victoria. We adjusted the angle of the solar array to 52 deg (the optimal angle for winter solar gain at Heathcote) and are happy to say that unlike previous years, we have no power issues at all this year. Wends has spent over a week at the house in the depths of winter with cloudy conditions and little sun and experienced no problems with loss of power or excessive battery drain. So very happy about that.
The other project that has been happening is the gradual insulating of the walls and replacing of weatherboards. When finished this should improve the overall heating and cooling of the house and subsequently reduce the amount of wood burned in winter.
The dams are all full again and the country is looking great coming into spring.
The next job is to get the vine site ripped for planting preparation!
I know this post is a bit late but we wanted to see how the upgraded wind/solar system performed over the (very cold) winter that we just experienced in Victoria. We adjusted the angle of the solar array to 52 deg (the optimal angle for winter solar gain at Heathcote) and are happy to say that unlike previous years, we have no power issues at all this year. Wends has spent over a week at the house in the depths of winter with cloudy conditions and little sun and experienced no problems with loss of power or excessive battery drain. So very happy about that.
The other project that has been happening is the gradual insulating of the walls and replacing of weatherboards. When finished this should improve the overall heating and cooling of the house and subsequently reduce the amount of wood burned in winter.
The dams are all full again and the country is looking great coming into spring.
The next job is to get the vine site ripped for planting preparation!
Monday, April 22, 2013
Pergola
Finally completed stage one of the deck roofing. Stage two is an enclosed living area on the return part of the deck complete with pot belly stove, comfy couches and cafe blinds. The idea is a kind of "cigar lounge" for the winter.
Sunday, December 16, 2012
Saturday, May 26, 2012
Welcome to THREE DAMS ESTATE
This blog is a collection of info and photos from our sustainable Eco project in the Heathcote wine growing area of Central Victoria. In Nov 2007, we purchased a 20 acre plot of elevated land just out of town and set about creating a lifestyle based on sustainable living and minimal resource use. The house itself was rescued from demolition in suburban Melbourne and transported to the property in 2 stages and was positioned facing due north to allow maximum sun exposure for the solar panels. The house is heated in winter by a slow combustion heater (generously donated by a friend) that burns wood salvaged from fallen trees on the property and in the surrounding State Forest. Rainwater is stored in a 55,000 litre water tank and most of our fresh vegetables and herbs are grown on site in the large fenced vegetable garden. All food scraps are composted and bottles, papers, metals etc are all recycled. The house is fully off grid and is powered by a hybrid 1kW PV solar/wind turbine system. The solar array is adjustable to maximise solar gain at different times of the year.
Subscribe to:
Posts (Atom)













